Davao City Construction Services

Building Permit in Davao City

Building a home or renovating a property? Learn the permit requirements and how to apply through Davao City’s official online building permit system.

Illustration of a modern building and architectural plans
Before You Begin

Your Building Permit in 3 Steps

A quick look at the process before your construction project begins.

01 / Prepare

Get Your Documents Ready

Gather property records, application forms, and plans prepared by qualified professionals.

02 / Apply

Submit Through OBPS

Apply through Davao City’s official online system and follow the document review process.

03 / Approval

Complete Review & Payment

Address any required corrections, pay assessed fees, and obtain your approved building permit.

Responsible Office: Office of the City Building Official (OCBO). Printed plans or in-person verification may also be required during processing.

Eligibility & Permit Rules

Who Needs a Building Permit in Davao City?

Most construction and major alteration projects require approval before work begins. Whether you’re building a house or changing an existing structure, check the nature of your project before starting construction.

When a Permit Is Needed

Check Your Construction Project

Under the National Building Code, the following types of work generally require a building permit or other approval from the City Building Official.

01

New Building Construction

Constructing a new house, apartment, commercial building, warehouse, or other permanent structure.

02

Building Extensions & Additions

Adding another floor, extending living space, or increasing the existing building’s size.

03

Structural Renovations & Major Repairs

Altering columns, beams, foundations, load-bearing walls, or other important structural parts of a building.

04

Changes in Building Use

Converting a residential property into a commercial space or making alterations for a different occupancy classification.

05

Demolition or Relocation

Demolishing or moving an existing structure. Separate demolition or other accessory permits may also be required.

Possible Exemptions

What About Minor Repairs?

Certain minor, non-structural repairs, such as replacing damaged floor finishes, repairing doors or windows, or replacing roofing sheets without changing structural members, may qualify for an exemption.

Ask OCBO first. An exemption depends on the exact work and applicable building rules. Do not assume that every small renovation is automatically exempt.

Who Can Apply?

Property Owners & Authorized Applicants

Property owners, developers, businesses, and other persons or entities with legal authority over the property may apply for a building permit.

If someone applies on the owner’s behalf, OCBO may require written authorization and supporting ownership or property-use documents.

Document Checklist

Building Permit Requirements in Davao City

Prepare your ownership records, application forms, and professional building plans before submitting your request. Some documents depend on the size, location, and type of construction.

01 / APPLICATION

Application & Property Documents

These documents establish who is applying and their legal authority to build on the property.

  • Notarized application letter from the owner or authorized applicant.
  • Notarized Unified Building Permit Application Form, properly completed and signed.
  • Certified true copy of the land title and the property’s current tax declaration.
  • Current Real Property Tax Receipt from the City Treasurer’s Office.
  • Valid government ID of the owner or applicant, with three specimen signatures.
  • Proof of authority to construct, if applicable. Non-owners may need a notarized lease, deed of sale, authority to construct, or Special Power of Attorney.
02 / BUILDING PLANS

Architectural & Engineering Plans

Hire qualified, licensed professionals to prepare and sign the technical plans for your construction project.

  • Architectural plans and permit form showing the proposed building layout, elevations, and design.
  • Civil and structural plans covering foundations, columns, beams, and other structural elements.
  • Sanitary and plumbing plans and the corresponding permit form.
  • Electrical plans and permit form prepared by the appropriate licensed electrical professional.
  • Mechanical and electronics plans with their permit forms, where applicable to the project.
  • Lot plan, vicinity map, relocation survey plan, and reports signed and sealed by a licensed Geodetic Engineer.
  • PRC ID, current Professional Tax Receipt (PTR), and TIN of each signing professional.
03 / TECHNICAL CLEARANCES

Supporting Reports & Clearances

The proposed construction must also meet applicable zoning, fire safety, and technical requirements.

  • Zoning/Locational Clearance from the City Planning and Development Office (CPDO).
  • Fire Safety Evaluation Certificate from the Bureau of Fire Protection (BFP).
  • Project technical specifications signed and sealed by the qualified design professional.
  • Bill of materials and cost estimates for the proposed construction.
  • Seismic analysis prepared by the relevant technical professionals.
  • Clear site photographs showing the location and nearby landmarks, or a detailed map image.
04 / SPECIAL CASES

Additional Requirements, If Applicable

Larger buildings, roadside properties, and specialized developments may need extra documents.

  • Three-storey or taller projects: Construction Safety and Health Program (CSHP) and applicable geotechnical or load-test reports.
  • Adding another floor: supporting affidavit confirming the foundation can carry the proposed additional storey.
  • Roadside properties: DPWH clearance for national highways, or Road Right-of-Way Clearance from the City Engineer’s Office where required.
  • Special structures: CAAP clearance for applicable tall structures, or DENR environmental clearance when required.
  • Major developments: drainage clearance or Traffic Impact Assessment and supporting site plans, as applicable.
  • Corporate or subdivision applicants: relevant board authorization, development permit, or approved project plans.

Before submitting: The 2026 City Citizen’s Charter lists multiple signed paper copies and plan sets. Because OBPS supports online pre-evaluation, confirm the final printed-copy requirement with OCBO before paying for reproduction.

Official Building Permit System
Application Process

How to Apply for a Building Permit in Davao City

From preparing your documents to receiving approval, follow these eight steps to understand how the application moves through Davao City’s building permit process.

Phase 01 / Getting Started

Prepare & Submit

Complete your application and send the required plans and documents for initial evaluation.

01

Open the OBPS Portal

Visit Davao City’s official Online Building-Related Permit System (OBPS). Register or sign in as prompted, then begin a building permit application.

02

Fill Out Your Application

Provide the owner’s details, project address, construction type, and other requested information. Have the required forms and professional plans signed and sealed.

03

Upload Your Documents

Submit ownership records, architectural and engineering plans, and applicable clearances. Save the application reference for future tracking.

Phase 02 / Evaluation

Review & Inspection

OCBO examines your submission and checks compliance before payment and final approval.

04

Wait for Technical Review

OCBO evaluates the submitted plans and requirements. Check your status in OBPS and respond to requests for corrected plans, additional documents, or relevant technical clearances.

05

Complete Required Site Checks

If a site inspection or in-person verification is required, follow OCBO’s schedule and instructions. Make the site accessible and resolve any deficiencies identified during the review.

Phase 03 / Final Approval

Payment & Permit Release

Complete the assessed payment and follow the instructions for the release of your permit.

06

Get the Payment Assessment

Once the required evaluation is complete, review the assessed charges and obtain the Order of Payment when issued for your transaction.

07

Pay the Permit Fees

Settle the required fees through the payment channel indicated by OCBO or OBPS. Keep the official receipt or payment confirmation.

08

Receive Your Permit

Follow the release instructions once the permit is approved. Obtain the permit and approved plans, and retain them for construction and future inspections.

Ready to Start Your Application?

Use Davao City’s official system to submit your application, track its status, and follow payment or release instructions.

Open Official OBPS

Important: OCBO may require printed plans, original documents, or an in-person appointment even after online submission. Do not begin construction requiring a permit until the permit is officially issued.

Fees & Processing Details

Building Permit Fees, Processing Time & Validity

Understand how permit charges are assessed, how long processing may take, and when an issued building permit can expire.

01 / Permit Fees

How Much Does a Building Permit Cost?

There is no single fixed fee for every building project in Davao City. OCBO calculates the applicable charges based on your submitted plans and the official fee schedule.

The official assessment considers:

  • Building occupancy or use
  • Total construction cost
  • Floor area of the structure
  • Building height
Official Fee Example

The 2026 Citizen’s Charter gives an example of a 75-square-meter Division A-1 building assessed at ₱4.80 per square meter, resulting in a ₱360 basic building fee.

This is an example of one building fee component, not the total cost of a complete permit. Other applicable permit, inspection, clearance, and professional fees may increase the overall expense.

02 / Processing Time

How Long Does Approval Take?

Processing begins with the assessment of submitted documents and continues through technical review, inspection, payment, and final permit approval.

19 Days + 6 Hours 25 Minutes

This is the published total processing time in Davao City’s 2026 Citizen’s Charter for the issuance of a building permit.

The estimate is not a guaranteed completion date. It excludes the separate processing time of the City Planning and Development Office (CPDO). Incomplete submissions, requested corrections, and additional clearances can extend the actual timeline.

03 / Permit Validity

When Does a Building Permit Expire?

Under Section 305 of the National Building Code, an issued building permit can become null and void in either of these situations.

1 Year

Construction Not Started

The permit expires if the authorized building work does not begin within one year from the permit date.

120 Days

Work Suspended or Abandoned

The permit becomes null and void if construction is suspended or abandoned for 120 days after work has begun.

Project delayed? Contact OCBO before restarting construction to confirm whether a new permit or further approval is required.

Important: Pay only the amount stated in your official assessment or Order of Payment, and keep the Official Receipt for permit release and future inspections.

View Official 2026 Fee Schedule
Application Support

Track Your Building Permit & Resolve Delays

Already submitted your application? Learn how to check progress, respond to document requests, and follow up when your permit is taking longer than expected.

How to Check Your Application Status

01

Open OBPS

Visit Davao City’s official building permit portal and sign in using the account associated with your application.

02

Find Your Application

Locate your submitted project and review its current status. Keep your application reference handy for identification.

03

Review the Updates

Check for evaluation results, requested corrections, or further instructions. Also monitor any SMS updates sent by OCBO.

Tip: If your application needs changes, read the evaluator’s instructions carefully before uploading revised documents.

Check Status on OBPS

Common Issues & What to Do

01

Missing or Unreadable Documents

Review the missing document notice. Upload a complete, readable copy and make sure all required signatures, seals, or notarizations are present before resubmitting.

02

Plans Returned for Correction

Ask your licensed architect or engineer to review the evaluator’s comments. Correct the relevant plans and resubmit the revised files following OCBO’s instructions.

03

Pending Zoning or Fire Clearance

Check which clearance is outstanding. Follow up with the relevant office, such as CPDO or BFP, and provide the document or confirmation requested for your application.

04

Inspection or Verification Delay

Contact OCBO using your application reference to confirm whether a site visit, original document inspection, or appointment is still required.

05

Payment or Permit Release Pending

Check that the assessed fees were paid through an authorized channel. Keep your Official Receipt or payment confirmation and ask OCBO whether anything else is required for release.

Still Waiting for an Update?

Contact the Office of the City Building Official. Provide your application reference, project address, submission date, and a brief explanation of the issue so staff can identify your transaction.

Important: A pending application is not an approved building permit. Do not begin construction requiring a permit until OCBO issues the official approval.

Common Questions

Building Permit FAQs

Quick answers to common questions about construction permits, applications, and approvals in Davao City.

01 Do small home renovations require a building permit?

It depends on the work involved. Structural changes, extensions, and major repairs generally require approval. Certain minor, non-structural repairs may be exempt. Confirm your project’s classification with OCBO before construction starts.

02 Can I apply for a building permit online?

Yes. Davao City’s Online Building-Related Permit System (OBPS) supports document submission, application tracking, and payment procedures. OCBO may still request printed plans or an in-person appointment during processing.

03 Can I apply if the land is not registered in my name?

You may apply if you have the necessary legal authority to construct. Depending on your situation, OCBO may require a lease agreement, owner’s authorization, or other supporting documents together with the property title.

04 Can construction begin while my permit is pending?

No. Work requiring a building permit should not begin until the Building Official has issued the required approval. Submitting an application or paying an assessment does not authorize construction.

05 Can I change my building plans after approval?

Changes to approved plans require the Building Official’s approval. Coordinate with your licensed architect or engineer and submit revised plans as instructed by OCBO before carrying out the changes.

06 Is the building permit fee the same for every project?

No. The amount depends on your project’s classification, dimensions, and applicable technical permits or charges. OCBO provides the official assessment. Pay only through an authorized channel and retain your receipt.

07 How long is an approved building permit valid?

Under the National Building Code, a permit becomes null and void if construction does not start within one year from issuance, or if work is suspended or abandoned for 120 days after starting. Contact OCBO about any expired permit before resuming work.

08 Do I need another permit after construction is finished?

Yes, a Certificate of Occupancy is required before a completed building is used or occupied. OCBO reviews the completion documents and applicable inspection results before issuing occupancy approval.

Where to Go Next

Next Guide: Occupancy Permit

Finished your construction project? Learn how to apply for an Occupancy Permit in Davao City, prepare the required documents, and complete the inspection and approval process.